TSX: SEA (SEA.TO)
NYSE: SA

Seabridge is currently redesigning the large-scale project assumed in the 2012 Pre-Feasibility Study to determine if a smaller, less capital-intensive design with a smaller footprint could improve economics and enhance the permitting process. Various mine development and mine operating plans are being tested to maximize the value of the project. These analyses are ongoing and will inform additional field programs upon completion.

Notes
The scientific and technical information in respect of the KSM Project herein was derived from the technical Report entitled KSM (Kerr – Sulphurets – Mitchell) Prefeasibility Study and Preliminary Economic Assessment dated effective August 8, 2022. This information was prepared by leading consulting firms and their Qualified Persons (as defined in NI 43-101), all of who are independent of Seabridge and are listed below along with their areas of responsibility:
(i) Tetra Tech, Inc. under the direction of Hassan Ghaffari P.Eng (surface infrastructure, capital estimate and financial analysis), John Huang P.Eng. (metallurgical testing review, permanent water treatment, mineral process design and operating cost estimation for process, general and administrative (“G&A”) and site services, and overall report preparation)
(ii) Wood Canada Limited, under the direction of Henry Kim P.Geo. (Mineral Resources)
(iii) Moose Mountain Technical Services under the direction of Jim Gray P.Eng. (open pit Mineral Reserves, open pit mining operations, mine capital and mine operating costs, MTT and rail ore conveyance design, tunnel capital costs)
(iv) N. Brazier Associates Inc. under the direction of W.N. Brazier P.Eng. (Electrical power supply, energy recovery plants)
(v) ERM Consultants Canada Ltd. under the direction of Rolf Schmitt P.Geo. (environment and permitting)
(vi) Klohn Crippen Berger Ltd. under the direction of David Willms P.Eng (design of surface water diversions, diversion tunnels, tailing management facility, water treatment dam and RSF and tunnel geotechnical)
(vii) BGC Engineering Inc. under the direction of Derek Kinakin P.Geo., P.L.Eng., P.G. (rock mechanics, geohazards and mining pit slopes)
(viii) WSP Golder Inc., under the direction of Ross Hammett P.Eng (Block Cave mining)